Renewable sitesLand of coal pit lane

Land of coal pit lane

Land of coal pit lane is an operational 5 MW solar farm in Ribble Valley, generating since 31 March 2016. Planning permission was granted on 21 August 2015, 3 months after submission. Operator of record: Wirsol Energy/Island Green Power.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2016
Solar Photovoltaics
Technology
Wirsol Energy/Island Green Power
Ribble Valley
Authority
England

Planning and build timeline

Application submitted22 May 2015
Permission granted21 August 2015
3 months after submission
Operational31 March 2016
7 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Ribble Valley: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land of coal pit lane’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.199.6 km
Solar Photovoltaics · Under Construction
0.2213.2 km
Battery · Under Construction
7014 km
Landfill Gas · Operational
1.914.5 km
Landfill Gas · Operational
1.814.7 km
Landfill Gas · Operational
1.914.9 km

How big is Land of coal pit lane?

Land of coal pit lane has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land of coal pit lane?

REPD records the operator as Wirsol Energy/Island Green Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land of coal pit lane approved and built?

The application was submitted on 22 May 2015. Permission was granted on 21 August 2015, 3 months later. The site became operational on 31 March 2016, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5264.