Chelker Reservoir (Retention of Turbines)
Chelker Reservoir (Retention of Turbines) is an operational 1.2 MW onshore wind farm in North Yorkshire, generating since 1 May 2004. Planning permission was granted on 30 May 2001, 4 months after submission. Operator of record: Yorkshire Water.
Planning and build timeline
| Application submitted | 24 January 2001 |
| Permission granted | 30 May 2001 4 months after submission |
| Operational | 1 May 2004 35 months after consent |
Screening a site of your own?
North Yorkshire approves 72% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Chelker Reservoir (Retention of Turbines)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on onshore wind
North Yorkshire has decided 18 onshore wind schemes and approved 72%, taking a median of 5.8 months. See every onshore wind scheme decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 1.3 | 0 km |
Landfill Gas · Operational | 2 | 4.5 km |
Solar Photovoltaics · Operational | 0.19 | 14.7 km |
How big is Chelker Reservoir (Retention of Turbines)?
Chelker Reservoir (Retention of Turbines) has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Chelker Reservoir (Retention of Turbines)?
REPD records the operator as Yorkshire Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Chelker Reservoir (Retention of Turbines) approved and built?
The application was submitted on 24 January 2001. Permission was granted on 30 May 2001, 4 months later. The site became operational on 1 May 2004, 35 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2747.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode