Renewable sites › Scroby Sands�
Scroby Sands�
Scroby Sands� is operational in DECC (S36) with a recorded capacity of 60 MW, and has been generating since 2004-03-01.
Planning and build timeline
| Application submitted | 2001-03-05 |
| Permission granted | 2002-12-01 21 months after submission |
| Operational | 2004-03-01 15 months after consent |
What this site sits on
- Special Area of Conservation — Southern North Sea
- Special Protection Area — Outer Thames Estuary
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Nova Scotia Farm solar park Solar Photovoltaics · Operational | 13.9 | 6.3 km |
James Paget University Hospital - Design And Installation Of PV Panels Solar Photovoltaics · Under Construction | — | 10.3 km |
Bloodhills - repowering Wind Onshore · Operational | 1 | 11 km |
South Beach Wind Turbine (Somerton) Wind Onshore · Operational | 1.5 | 11.7 km |
How big is Scroby Sands�?
Scroby Sands� has a recorded installed capacity of 60 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Scroby Sands�?
REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Scroby Sands� approved and built?
The application was submitted on 2001-03-05. Permission was granted on 2002-12-01, 21 months later. The site became operational on 2004-03-01, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2498.
Novarly Parcel · official public data, read properly · parcel.novarly.com