South Beach Wind Turbine (Somerton) is an operational 1.5 MW onshore wind farm in Great Yarmouth, generating since 22 July 2000. Planning permission was granted on 28 April 2000, 11 months after submission. Operator of record: Ecotricity.
Planning and build timeline
| Application submitted | 21 May 1999 |
| Permission granted | 28 April 2000 11 months after submission |
| Operational | 22 July 2000 3 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Great Yarmouth: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with South Beach Wind Turbine (Somerton)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
- Nutrient-neutrality catchment — The Broads SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 1 | 0.7 km |
Solar Photovoltaics · Operational | 13.9 | 6.2 km |
Wind Offshore · Operational | 60 | 11.7 km |
How big is South Beach Wind Turbine (Somerton)?
South Beach Wind Turbine (Somerton) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates South Beach Wind Turbine (Somerton)?
REPD records the operator as Ecotricity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was South Beach Wind Turbine (Somerton) approved and built?
The application was submitted on 21 May 1999. Permission was granted on 28 April 2000, 11 months later. The site became operational on 22 July 2000, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2555.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode