Novarly ParcelRenewable sites

Renewable sitesNova Scotia Farm solar park

Nova Scotia Farm solar park

Nova Scotia Farm solar park is operational in Great Yarmouth with a recorded capacity of 13.9 MW, and has been generating since 2014-03-31.

13.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-31
Solar Photovoltaics
Technology
Equitix
Great Yarmouth
Authority
England

Planning and build timeline

Application submitted2013-04-16
Permission granted2013-07-10
3 months after submission
Operational2014-03-31
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Great Yarmouth’s record on solar

Great Yarmouth has decided 8 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in Great Yarmouth

Other built sites within 15 km

SiteMWDistance
Bloodhills - repowering
Wind Onshore · Operational
15.6 km
South Beach Wind Turbine (Somerton)
Wind Onshore · Operational
1.56.2 km
Scroby Sands�
Wind Offshore · Operational
606.3 km
James Paget University Hospital - Design And Installation Of PV Panels
Solar Photovoltaics · Under Construction
11.2 km

How big is Nova Scotia Farm solar park?

Nova Scotia Farm solar park has a recorded installed capacity of 13.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Nova Scotia Farm solar park?

REPD records the operator as Equitix. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Nova Scotia Farm solar park approved and built?

The application was submitted on 2013-04-16. Permission was granted on 2013-07-10, 3 months later. The site became operational on 2014-03-31, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1328.