Renewable sites › Bentwaters CHP
Bentwaters CHP
Bentwaters CHP is operational in East Suffolk with a recorded capacity of 4.6 MW, and has been generating since 2010-11-01.
Planning and build timeline
| Application submitted | 2007-10-11 |
| Permission granted | not recorded |
| Operational | 2010-11-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- National Landscape (AONB) — Suffolk Coast & Heaths
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bentwaters Park Anaerobic Digestion · Operational | 2 | 0 km |
Bentwaters Park (extension) Anaerobic Digestion · Operational | 1.8 | 1 km |
Lower Ufford Lane Solar Photovoltaics · Operational | 1.1 | 4.5 km |
Rock Barracks Solar Farm Solar Photovoltaics · Under Construction | 1.5 | 5.3 km |
Parham Airfield (Great Glenham) Solar Photovoltaics · Operational | 17.5 | 7.5 km |
Foxburrow Farm Solar Photovoltaics · Operational | 8 | 13.6 km |
Foxhall Landfill Site Landfill Gas · Operational | 1.2 | 14.5 km |
How big is Bentwaters CHP?
Bentwaters CHP has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bentwaters CHP?
REPD records the operator as REG Bio-Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bentwaters CHP approved and built?
The application was submitted on 2007-10-11. REPD does not record a grant date. The site became operational on 2010-11-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 130.