Renewable sitesBentwaters CHP

Bentwaters CHP

Bentwaters CHP is operational in East Suffolk with a recorded capacity of 4.6 MW, and has been generating since 2010-11-01.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-11-01
Biomass (dedicated)
Technology
REG Bio-Power
East Suffolk
Authority
England

Planning and build timeline

Application submitted2007-10-11
Permission grantednot recorded
Operational2010-11-01

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bentwaters Park
Anaerobic Digestion · Operational
20 km
Bentwaters Park (extension)
Anaerobic Digestion · Operational
1.81 km
Lower Ufford Lane
Solar Photovoltaics · Operational
1.14.5 km
Rock Barracks Solar Farm
Solar Photovoltaics · Under Construction
1.55.3 km
Parham Airfield (Great Glenham)
Solar Photovoltaics · Operational
17.57.5 km
Foxburrow Farm
Solar Photovoltaics · Operational
813.6 km
Foxhall Landfill Site
Landfill Gas · Operational
1.214.5 km

How big is Bentwaters CHP?

Bentwaters CHP has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bentwaters CHP?

REPD records the operator as REG Bio-Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bentwaters CHP approved and built?

The application was submitted on 2007-10-11. REPD does not record a grant date. The site became operational on 2010-11-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 130.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council