Novarly ParcelRenewable sites

Renewable sitesBentwaters CHP

Bentwaters CHP

Bentwaters CHP is an operational 4.6 MW biomass plant in East Suffolk, generating since 1 November 2010. REPD does not record the planning grant date. Operator of record: REG Bio-Power.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2010
Biomass (dedicated)
Technology
REG Bio-Power
East Suffolk
Authority
England

Planning and build timeline

Application submitted11 October 2007
Permission grantednot recorded
Operational1 November 2010

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Suffolk: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bentwaters CHP’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
20 km
Anaerobic Digestion · Operational
1.81 km
Solar Photovoltaics · Operational
1.14.5 km
Solar Photovoltaics · Under Construction
1.55.3 km
Solar Photovoltaics · Operational
17.57.5 km
Solar Photovoltaics · Operational
813.6 km
Landfill Gas · Operational
1.214.5 km

How big is Bentwaters CHP?

Bentwaters CHP has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bentwaters CHP?

REPD records the operator as REG Bio-Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bentwaters CHP approved and built?

The application was submitted on 11 October 2007. REPD does not record a grant date. The site became operational on 1 November 2010.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 130.