Novarly ParcelRenewable sites

Renewable sitesBentwaters Park

Bentwaters Park

Bentwaters Park is an operational 2 MW anaerobic digestion plant in East Suffolk, generating since 21 November 2012. Planning permission was granted on 8 April 2010, 16 months after submission. Operator of record: Agri-Gen.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 21 November 2012
Anaerobic Digestion
Technology
Agri-Gen
East Suffolk
Authority
England

Planning and build timeline

Application submitted3 December 2008
Permission granted8 April 2010
16 months after submission
Operational21 November 2012
31 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Suffolk: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bentwaters Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
4.60 km
Anaerobic Digestion · Operational
1.81 km
Solar Photovoltaics · Operational
1.14.5 km
Solar Photovoltaics · Under Construction
1.55.3 km
Solar Photovoltaics · Operational
17.57.5 km
Solar Photovoltaics · Operational
813.6 km
Landfill Gas · Operational
1.214.5 km

How big is Bentwaters Park?

Bentwaters Park has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bentwaters Park?

REPD records the operator as Agri-Gen. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bentwaters Park approved and built?

The application was submitted on 3 December 2008. Permission was granted on 8 April 2010, 16 months later. The site became operational on 21 November 2012, 31 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5755.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode