Bentwaters Park is operational in East Suffolk with a recorded capacity of 2 MW, and has been generating since 2012-11-21.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-11-21
Anaerobic Digestion
Technology
Agri-Gen
East Suffolk
Authority
England

Planning and build timeline

Application submitted2008-12-03
Permission granted2010-04-08
16 months after submission
Operational2012-11-21
31 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bentwaters CHP
Biomass (dedicated) · Operational
4.60 km
Bentwaters Park (extension)
Anaerobic Digestion · Operational
1.81 km
Lower Ufford Lane
Solar Photovoltaics · Operational
1.14.5 km
Rock Barracks Solar Farm
Solar Photovoltaics · Under Construction
1.55.3 km
Parham Airfield (Great Glenham)
Solar Photovoltaics · Operational
17.57.5 km
Foxburrow Farm
Solar Photovoltaics · Operational
813.6 km
Foxhall Landfill Site
Landfill Gas · Operational
1.214.5 km

How big is Bentwaters Park?

Bentwaters Park has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bentwaters Park?

REPD records the operator as Agri-Gen. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bentwaters Park approved and built?

The application was submitted on 2008-12-03. Permission was granted on 2010-04-08, 16 months later. The site became operational on 2012-11-21, 31 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5755.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council