Renewable sitesNorwich Road Industrial Estate

Norwich Road Industrial Estate

Norwich Road Industrial Estate is a 50 MW battery storage site under construction in East Suffolk. Planning permission was granted on 26 March 2021, 2 months after submission. Operator of record: Eelpower Limited.

50 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Eelpower Limited
East Suffolk
Authority
England

Planning and build timeline

Application submitted3 February 2021
Permission granted26 March 2021
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

East Suffolk approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Norwich Road Industrial Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on battery storage

East Suffolk has decided 6 battery storage schemes and approved 100%, taking a median of 4.5 months. See every battery storage scheme decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
111.3 km
Wind Onshore · Operational
11.51.9 km
Solar Photovoltaics · Operational
12.32.4 km
Solar Photovoltaics · Operational
3.99.6 km
Solar Photovoltaics · Operational
8.610.7 km
Solar Photovoltaics · Operational
1.710.8 km
Solar Photovoltaics · Operational
13.210.9 km
Solar Photovoltaics · Operational
1011.3 km

How big is Norwich Road Industrial Estate?

Norwich Road Industrial Estate has a recorded installed capacity of 50 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Norwich Road Industrial Estate?

REPD records the operator as Eelpower Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Norwich Road Industrial Estate approved and built?

The application was submitted on 3 February 2021. Permission was granted on 26 March 2021, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12529.