Holton Airfield is operational in East Suffolk with a recorded capacity of 11 MW, and has been generating since 2013-12-19.

11 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-12-19
Solar Photovoltaics
Technology
Private Developer
East Suffolk
Authority
England

Planning and build timeline

Application submitted2012-10-15
Permission granted2012-12-19
2 months after submission
Operational2013-12-19
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on solar

East Suffolk has decided 33 solar farms and approved 97%, taking a median of 3 months. See every solar farm decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Upper Holton Wind Farm
Wind Onshore · Operational
11.50.8 km
Norwich Road Industrial Estate
Battery · Under Construction
501.3 km
Chediston Hall Solar Park
Solar Photovoltaics · Operational
12.33.7 km
Reydon Farm
Solar Photovoltaics · Operational
3.98.5 km
Playters Solar Farm
Solar Photovoltaics · Operational
8.69.7 km
Promens Solar
Solar Photovoltaics · Operational
1.79.8 km
Ellough Airfield (Resubmission)
Solar Photovoltaics · Operational
13.29.8 km
Ellough Airfield (Ellough 2 extension)
Solar Photovoltaics · Operational
1010.3 km

How big is Holton Airfield?

Holton Airfield has a recorded installed capacity of 11 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Holton Airfield?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Holton Airfield approved and built?

The application was submitted on 2012-10-15. Permission was granted on 2012-12-19, 2 months later. The site became operational on 2013-12-19, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1715.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council