Renewable sites › Pingry Farm - Phase 2
Pingry Farm - Phase 2
Pingry Farm - Phase 2 is operational in Forest of Dean with a recorded capacity of 3.4 MW, and has been generating since 2015-03-25.
Planning and build timeline
| Application submitted | 2013-03-06 |
| Permission granted | 2013-04-11 1 months after submission |
| Operational | 2015-03-25 23 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Forest of Dean’s record on solar
Forest of Dean has decided 25 solar farms and approved 76%, taking a median of 3.1 months. See every solar farm decision in Forest of Dean →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pingry Farm - Phase 1 Solar Photovoltaics · Operational | 3.4 | 0 km |
Yorkley Solar Park Solar Photovoltaics · Operational | 5 | 7.2 km |
Jones Food Company - Solar Farm Solar Photovoltaics · Operational | 0.71 | 8.3 km |
A J Lowther and Son Premise Solar Photovoltaics · Under Construction | 1 | 9.1 km |
Hurst Farm Solar Photovoltaics · Operational | 5 | 9.9 km |
Plusterwine House - Anaerobic Digestion Plant (Retrospective) Anaerobic Digestion · Operational | 1.5 | 10.4 km |
Sharpness Docks Wind Onshore · Operational | 2 | 11.8 km |
Vantage Point Solar Photovoltaics · Operational | 1.4 | 13.4 km |
How big is Pingry Farm - Phase 2?
Pingry Farm - Phase 2 has a recorded installed capacity of 3.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pingry Farm - Phase 2?
REPD records the operator as Coleford Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pingry Farm - Phase 2 approved and built?
The application was submitted on 2013-03-06. Permission was granted on 2013-04-11, 1 months later. The site became operational on 2015-03-25, 23 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5230.
Novarly Parcel · official public data, read properly · parcel.novarly.com