Renewable sites › Vantage Point
Vantage Point
Vantage Point is operational in Forest of Dean with a recorded capacity of 1.4 MW, and has been generating since 2011-09-29.
Planning and build timeline
| Application submitted | 2011-05-03 |
| Permission granted | 2011-06-15 1 months after submission |
| Operational | 2011-09-29 3 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Forest of Dean’s record on solar
Forest of Dean has decided 25 solar farms and approved 76%, taking a median of 3.1 months. See every solar farm decision in Forest of Dean →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Stantway Solar Farm Solar Photovoltaics · Operational | 5 | 7.8 km |
Leeways Solar Photovoltaics · Operational | 0.5 | 8 km |
Land At Rymes Farm (Phase 2)/Grange Solar Farm Solar Photovoltaics · Operational | 6.8 | 9.6 km |
Land At Rymes Farm (Phase 1) Solar Photovoltaics · Operational | 6.9 | 9.7 km |
Highleadon - Solar Arrays & Battery Storage Battery · Operational | — | 10.6 km |
Highleadon - Solar Arrays & Battery Storage Solar Photovoltaics · Operational | 49.9 | 10.6 km |
A J Lowther and Son Premise Solar Photovoltaics · Under Construction | 1 | 10.9 km |
Pingry Farm - Phase 1 Solar Photovoltaics · Operational | 3.4 | 13.4 km |
How big is Vantage Point?
Vantage Point has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Vantage Point?
REPD records the operator as Bee Green Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Vantage Point approved and built?
The application was submitted on 2011-05-03. Permission was granted on 2011-06-15, 1 months later. The site became operational on 2011-09-29, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1513.