Plusterwine House - Anaerobic Digestion Plant (Retrospective)

Plusterwine House - Anaerobic Digestion Plant (Retrospective) is an operational 1.5 MW anaerobic digestion plant in Forest of Dean, generating since 31 December 2016. Planning permission was granted on 2 March 2021, 4 months after submission. Operator of record: Plusterwine Biogas Limited.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 December 2016
Anaerobic Digestion
Technology
Plusterwine Biogas Limited
Forest of Dean
Authority
England

Planning and build timeline

Application submitted26 October 2020
Permission granted2 March 2021
4 months after submission
Operational31 December 2016

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Forest of Dean: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Plusterwine House - Anaerobic Digestion Plant (Retrospective)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.716.8 km
Solar Photovoltaics · Operational
56.8 km
Solar Photovoltaics · Operational
57 km
Solar Photovoltaics · Operational
57.1 km
Solar Photovoltaics · Operational
57.4 km
Wind Onshore · Operational
28.2 km
Solar Photovoltaics · Operational
3.410.4 km
Solar Photovoltaics · Operational
3.410.4 km

How big is Plusterwine House - Anaerobic Digestion Plant (Retrospective)?

Plusterwine House - Anaerobic Digestion Plant (Retrospective) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Plusterwine House - Anaerobic Digestion Plant (Retrospective)?

REPD records the operator as Plusterwine Biogas Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Plusterwine House - Anaerobic Digestion Plant (Retrospective) approved and built?

The application was submitted on 26 October 2020. Permission was granted on 2 March 2021, 4 months later. The site became operational on 31 December 2016.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8244.