Plusterwine House - Anaerobic Digestion Plant (Retrospective) is operational in Forest of Dean with a recorded capacity of 1.5 MW, and has been generating since 2016-12-31.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-12-31
Anaerobic Digestion
Technology
Plusterwine Biogas Limited
Forest of Dean
Authority
England

Planning and build timeline

Application submitted2020-10-26
Permission granted2021-03-02
4 months after submission
Operational2016-12-31

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Jones Food Company - Solar Farm
Solar Photovoltaics · Operational
0.716.8 km
Tump Solar Farm
Solar Photovoltaics · Operational
56.8 km
Hurst Farm
Solar Photovoltaics · Operational
57 km
Yorkley Solar Park
Solar Photovoltaics · Operational
57.1 km
Sedbury Park
Solar Photovoltaics · Operational
57.4 km
Sharpness Docks
Wind Onshore · Operational
28.2 km
Pingry Farm - Phase 2
Solar Photovoltaics · Operational
3.410.4 km
Pingry Farm - Phase 1
Solar Photovoltaics · Operational
3.410.4 km

How big is Plusterwine House - Anaerobic Digestion Plant (Retrospective)?

Plusterwine House - Anaerobic Digestion Plant (Retrospective) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Plusterwine House - Anaerobic Digestion Plant (Retrospective)?

REPD records the operator as Plusterwine Biogas Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Plusterwine House - Anaerobic Digestion Plant (Retrospective) approved and built?

The application was submitted on 2020-10-26. Permission was granted on 2021-03-02, 4 months later. The site became operational on 2016-12-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8244.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council