Renewable sites › Jones Food Company - Solar Farm
Jones Food Company - Solar Farm
Jones Food Company - Solar Farm is operational in Forest of Dean with a recorded capacity of 0.71 MW, and has been generating since 2024-02-22.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2024-02-22 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Forest of Dean’s record on solar
Forest of Dean has decided 25 solar farms and approved 76%, taking a median of 3.1 months. See every solar farm decision in Forest of Dean →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Yorkley Solar Park Solar Photovoltaics · Operational | 5 | 1.1 km |
Hurst Farm Solar Photovoltaics · Operational | 5 | 1.7 km |
Sharpness Docks Wind Onshore · Operational | 2 | 3.6 km |
Plusterwine House - Anaerobic Digestion Plant (Retrospective) Anaerobic Digestion · Operational | 1.5 | 6.8 km |
Pingry Farm - Phase 2 Solar Photovoltaics · Operational | 3.4 | 8.3 km |
Pingry Farm - Phase 1 Solar Photovoltaics · Operational | 3.4 | 8.3 km |
Land At Actrees Farm Solar Photovoltaics · Operational | 5 | 9.7 km |
Hillhouse Farm Solar Photovoltaics · Operational | 28.5 | 11.3 km |
How big is Jones Food Company - Solar Farm?
Jones Food Company - Solar Farm has a recorded installed capacity of 0.71 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Jones Food Company - Solar Farm?
REPD records the operator as Jones Food Company / Zestec Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Jones Food Company - Solar Farm approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2024-02-22.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15915.