Jones Food Company - Solar Farm is an operational 0.71 MW solar farm in Forest of Dean, generating since 22 February 2024. REPD does not record the planning grant date. Operator of record: Jones Food Company / Zestec Renewable Energy.

0.71 MW
Capacity
as recorded in REPD
Operational
Status
since 22 February 2024
Solar Photovoltaics
Technology
Jones Food Company / Zestec Renewable Energy
Forest of Dean
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational22 February 2024

Screening a site of your own?

RedlineUK · £39

Forest of Dean approves 76% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Jones Food Company - Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Forest of Dean’s record on solar

Forest of Dean has decided 25 solar farms and approved 76%, taking a median of 3.1 months. See every solar farm decision in Forest of Dean

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.1 km
Solar Photovoltaics · Operational
51.7 km
Wind Onshore · Operational
23.6 km
Anaerobic Digestion · Operational
1.56.8 km
Solar Photovoltaics · Operational
3.48.3 km
Solar Photovoltaics · Operational
3.48.3 km
Solar Photovoltaics · Operational
59.7 km
Solar Photovoltaics · Operational
28.511.3 km

How big is Jones Food Company - Solar Farm?

Jones Food Company - Solar Farm has a recorded installed capacity of 0.71 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Jones Food Company - Solar Farm?

REPD records the operator as Jones Food Company / Zestec Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Jones Food Company - Solar Farm approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 22 February 2024.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15915.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode