Renewable sites › Panasonic Manufacturing, Pentwyn - BESS
Panasonic Manufacturing, Pentwyn - BESS
Panasonic Manufacturing, Pentwyn - BESS is under construction in Cardiff with a recorded capacity of 1.08 MW.
Planning and build timeline
| Application submitted | 2024-04-22 |
| Permission granted | 2024-06-27 2 months after submission |
| Operational | not recorded |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Panasonic Manufacturing, Pentwyn - Hydrogen Fuel Cells Fuel Cell (Hydrogen) · Under Construction | 0.11 | 0 km |
Aldi - Cardiff Solar Photovoltaics · Operational | 1.5 | 3.6 km |
G24 Innovations Turbine Wind Onshore · Operational | 2.3 | 3.7 km |
Lamby Way Landfill Site Landfill Gas · Operational | 4 | 3.7 km |
Newport (Began Road) Solar Photovoltaics · Operational | 4.9 | 3.8 km |
Lamby Way Solar Farm Solar Photovoltaics · Operational | 8.9 | 4 km |
Cardiff Waste Water Treatment Sewage Sludge Digestion · Operational | 5.5 | 4.9 km |
Clearwell Farm - solar Solar Photovoltaics · Operational | 2 | 5.2 km |
How big is Panasonic Manufacturing, Pentwyn - BESS?
Panasonic Manufacturing, Pentwyn - BESS has a recorded installed capacity of 1.08 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Panasonic Manufacturing, Pentwyn - BESS?
REPD records the operator as Panasonic Manufacturing UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Panasonic Manufacturing, Pentwyn - BESS approved and built?
The application was submitted on 2024-04-22. Permission was granted on 2024-06-27, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16366.