Novarly ParcelRenewable sites

Renewable sitesAldi - Cardiff

Aldi - Cardiff

Aldi - Cardiff is an operational 1.5 MW solar farm in Cardiff, generating since 1 April 2016. REPD does not record the planning grant date. Operator of record: Aldi.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2016
Solar Photovoltaics
Technology
Aldi
Cardiff
Authority
Wales

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 April 2016

Screening a site of your own?

RedlineUK · £39

Cardiff approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Aldi - Cardiff’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Cardiff’s record on solar

Cardiff has decided 12 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Cardiff

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
40.4 km
Solar Photovoltaics · Operational
8.90.9 km
Wind Onshore · Operational
2.31.2 km
Sewage Sludge Digestion · Operational
5.52.6 km
Anaerobic Digestion · Operational
22.9 km
Fuel Cell (Hydrogen) · Under Construction
0.113.6 km
Battery · Under Construction
1.083.6 km
EfW Incineration · Operational
303.8 km

How big is Aldi - Cardiff?

Aldi - Cardiff has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Aldi - Cardiff?

REPD records the operator as Aldi. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aldi - Cardiff approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 April 2016.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6486.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode