G24 Innovations Turbine
G24 Innovations Turbine is an operational 2.3 MW onshore wind farm in Cardiff, generating since 12 July 2011. Planning permission was granted on 15 January 2008, 4 months after submission. Operator of record: G24 Innovations Limited.
Planning and build timeline
| Application submitted | 26 September 2007 |
| Permission granted | 15 January 2008 4 months after submission |
| Operational | 12 July 2011 42 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Cardiff: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with G24 Innovations Turbine’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.5 | 1.2 km |
Landfill Gas · Operational | 4 | 1.6 km |
Solar Photovoltaics · Operational | 8.9 | 2.1 km |
Fuel Cell (Hydrogen) · Under Construction | 0.11 | 3.7 km |
Battery · Under Construction | 1.08 | 3.7 km |
Sewage Sludge Digestion · Operational | 5.5 | 3.8 km |
Anaerobic Digestion · Operational | 2 | 4 km |
Solar Photovoltaics · Operational | 4.9 | 4.9 km |
How big is G24 Innovations Turbine?
G24 Innovations Turbine has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates G24 Innovations Turbine?
REPD records the operator as G24 Innovations Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was G24 Innovations Turbine approved and built?
The application was submitted on 26 September 2007. Permission was granted on 15 January 2008, 4 months later. The site became operational on 12 July 2011, 42 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2804.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode