Lamby Way Landfill Site

Lamby Way Landfill Site is an operational 4 MW landfill gas site in Cardiff, generating since 27 November 1998. Planning permission was granted on 3 October 1998, 14 months after submission. Operator of record: South Wales Power Ltd.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 27 November 1998
Landfill Gas
Technology
South Wales Power Ltd
Cardiff
Authority
Wales

Planning and build timeline

Application submitted12 August 1997
Permission granted3 October 1998
14 months after submission
Operational27 November 1998
2 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cardiff: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lamby Way Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.50.4 km
Solar Photovoltaics · Operational
8.90.5 km
Wind Onshore · Operational
2.31.6 km
Sewage Sludge Digestion · Operational
5.52.2 km
Anaerobic Digestion · Operational
22.6 km
EfW Incineration · Operational
303.5 km
Fuel Cell (Hydrogen) · Under Construction
0.113.7 km
Battery · Under Construction
1.083.7 km

How big is Lamby Way Landfill Site?

Lamby Way Landfill Site has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lamby Way Landfill Site?

REPD records the operator as South Wales Power Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lamby Way Landfill Site approved and built?

The application was submitted on 12 August 1997. Permission was granted on 3 October 1998, 14 months later. The site became operational on 27 November 1998, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 606.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode