Renewable sites › Lamby Way Landfill Site
Lamby Way Landfill Site
Lamby Way Landfill Site is operational in Cardiff with a recorded capacity of 4 MW, and has been generating since 1998-11-27.
Planning and build timeline
| Application submitted | 1997-08-12 |
| Permission granted | 1998-10-03 14 months after submission |
| Operational | 1998-11-27 2 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Aldi - Cardiff Solar Photovoltaics · Operational | 1.5 | 0.4 km |
Lamby Way Solar Farm Solar Photovoltaics · Operational | 8.9 | 0.5 km |
G24 Innovations Turbine Wind Onshore · Operational | 2.3 | 1.6 km |
Cardiff Waste Water Treatment Sewage Sludge Digestion · Operational | 5.5 | 2.2 km |
Cardiff Organic Waste Treatment Project Anaerobic Digestion · Operational | 2 | 2.6 km |
Trident Park EfW Incineration · Operational | 30 | 3.5 km |
Panasonic Manufacturing, Pentwyn - Hydrogen Fuel Cells Fuel Cell (Hydrogen) · Under Construction | 0.11 | 3.7 km |
Panasonic Manufacturing, Pentwyn - BESS Battery · Under Construction | 1.08 | 3.7 km |
How big is Lamby Way Landfill Site?
Lamby Way Landfill Site has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lamby Way Landfill Site?
REPD records the operator as South Wales Power Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lamby Way Landfill Site approved and built?
The application was submitted on 1997-08-12. Permission was granted on 1998-10-03, 14 months later. The site became operational on 1998-11-27, 2 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 606.