Overhill Farm, Rothienorman - Battery Energy Storage

Overhill Farm, Rothienorman - Battery Energy Storage is under construction in Aberdeenshire with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
One Planet Developments Limited
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2022-11-02
Permission granted2023-03-01
4 months after submission
Operationalnot recorded

Aberdeenshire’s record on battery storage

Aberdeenshire has decided 27 battery storage schemes and approved 96%, taking a median of 5.7 months. See every battery storage scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Gordonstown Hill Wind Farm
Wind Onshore · Operational
12.56.9 km
Glens of Foudland
Wind Onshore · Operational
267.3 km
Hill of Easterton Extension
Wind Onshore · Operational
28.3 km
Hill of Easterton
Wind Onshore · Operational
2.58.3 km
Mackies Dairy PV
Solar Photovoltaics · Operational
1.88.5 km
Hill of Tillymorgan (Kirkton Farm) Wind turbines
Wind Onshore · Operational
9.68.5 km
Shielburn Farm
Wind Onshore · Operational
6.910.8 km
Denhill
Wind Onshore · Operational
2.310.9 km

How big is Overhill Farm, Rothienorman - Battery Energy Storage?

Overhill Farm, Rothienorman - Battery Energy Storage has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Overhill Farm, Rothienorman - Battery Energy Storage?

REPD records the operator as One Planet Developments Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Overhill Farm, Rothienorman - Battery Energy Storage approved and built?

The application was submitted on 2022-11-02. Permission was granted on 2023-03-01, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11590.