Glens of Foudland is an operational 26 MW onshore wind farm in Aberdeenshire, generating since 22 July 2005. Planning permission was granted on 4 October 2001, 8 months after submission. Operator of record: Green Investment Bank (Blackrock).

26 MW
Capacity
as recorded in REPD
Operational
Status
since 22 July 2005
Wind Onshore
Technology
Green Investment Bank (Blackrock)
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted23 January 2001
Permission granted4 October 2001
8 months after submission
Operational22 July 2005
46 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Glens of Foudland’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
12.34.4 km
Battery · Under Construction
49.97.3 km
Wind Onshore · Operational
9.69.2 km
Wind Onshore · Operational
6.910 km
Wind Onshore · Operational
12.510.1 km

How big is Glens of Foudland?

Glens of Foudland has a recorded installed capacity of 26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glens of Foudland?

REPD records the operator as Green Investment Bank (Blackrock). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glens of Foudland approved and built?

The application was submitted on 23 January 2001. Permission was granted on 4 October 2001, 8 months later. The site became operational on 22 July 2005, 46 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3311.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode