Renewable sites › Roxwell Landfill Scheme
Roxwell Landfill Scheme
Roxwell Landfill Scheme is operational in Chelmsford with a recorded capacity of 1.3 MW, and has been generating since 1999-07-13.
Planning and build timeline
| Application submitted | 1994-10-12 |
| Permission granted | 1995-04-19 6 months after submission |
| Operational | 1999-07-13 51 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Dunmow Solar Farm, Chelmsford Road - Solar Farm Solar Photovoltaics · Under Construction | 9.89 | 11.3 km |
Drapers Farm Solar Park Solar Photovoltaics · Operational | 6 | 12.2 km |
Ongar Landfill Scheme Landfill Gas · Operational | 1 | 12.4 km |
Ongar Landfill Scheme 2 Landfill Gas · Operational | 1.8 | 12.5 km |
Slamseys Energy Storage Battery · Under Construction | 10 | 12.7 km |
Tooleys Farm Solar Photovoltaics · Operational | 5.3 | 13.6 km |
Hutton Battery Storage (Lower Road) Battery · Operational | 10 | 14.3 km |
How big is Roxwell Landfill Scheme?
Roxwell Landfill Scheme has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Roxwell Landfill Scheme?
REPD records the operator as Redland Aggregates Ltd (Lafarge Redland). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Roxwell Landfill Scheme approved and built?
The application was submitted on 1994-10-12. Permission was granted on 1995-04-19, 6 months later. The site became operational on 1999-07-13, 51 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 791.