Renewable planning Battery storageEast Suffolk

Battery storage planning in East Suffolk

East Suffolk has decided 6 battery storage schemes and approved 100% of them, taking a median of 4.5 months to decide. Consented capacity: 61 MW. 9 applications still awaiting a decision.

100%
Approved
6 granted · 0 refused
4.5 mo
Median decision
UK 6 mo
61 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How East Suffolk compares

Against the 137 UK authorities with 5+ battery storage decisions, East Suffolk sits in the 73rd percentile for approval rate (8 points above the England average) and the 68th percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 2 (2024)224Approved — 1 (2025)125Approved — 2 (2026)226
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (20)

SchemeMWStatusDecided
Africa Alive, Whites Lane - Battery Energy Storage System
Zoological Society of East Anglia · DC/26/0785/FUL
0.21Application Submitted2026-03-19
Ellough Road, Ellough - Micro Energy Storage
AMP Clean Energy · DC/26/0669/FUL
0.2Application Submitted2026-02-18
Suffolk Yacht Harbour, Levington - Solar Array
Suffolk Yacht Harbour Limited · DC/25/4142/FUL · 2.6 mo to decide
Awaiting Construction2026-01-30
The Street, Hacheston - Battery Energy Storage System
Balance Power Projects Limited · DC/25/4923/FUL
Application Submitted2026-01-19
Harvest Drive, Gisleham - Micro Energy Storage
AMP Clean Energy · DC/25/4228/FUL · 9.9 mo to decide
0.2Awaiting Construction2026-01-05
Kettleburgh Road Easton - Solar Panels & Battery Storage
Quintas Cleantech · DC/25/2733/FUL
50Application Submitted2025-07-10
Wilford Bridge Road, Station Road - Micro Energy Storage Unit
Aggregated Micro Power Holdings Plc · DC/25/0410/FUL
0.2Application Withdrawn2025-03-21
Wissett Solar Farm, Wissett - Battery Storage (Apple Tree)
Pathfinder Clean Energy UK Dev Limited · DC/22/3313/FUL · 28.7 mo to decide
10Awaiting Construction2025-02-17
Phoenix Business Park, Haddenham Road - Micro Energy Storage Facility
AMP Clean Energy · DC/24/1854/FUL · 4.5 mo to decide
0.2Awaiting Construction2024-10-15
Phoenix Road, Haddenham Road - Micro Energy Storage Facility
AMP Clean Energy · DC/24/1856/FUL · 4.5 mo to decide
0.2Awaiting Construction2024-10-14
Bliney Road, Grove Road - Micro Energy Storage
Aggregated Micro Power Holdings Plc · DC/24/2484/FUL
0.2Application Withdrawn2024-09-25
Bliney Road, Grove Road - Micro Energy Storage
Aggregated Micro Power Holdings Plc · DC/24/2484/FUL
0.2Application Withdrawn2024-09-25
J S T Uk, Blyth Road -Micro Energy Storage Facility
AMP Clean Energy · DC/24/2458/FUL
0.2Application Withdrawn2024-09-19
Wilford Bridge Road, Station Road - Micro Energy Storage Unit
Aggregated Micro Power Holdings Plc · DC/24/2485/FUL
0.2Revised2024-09-05
Beccles Road, Carlton Colville - Micro Energy Storage Unit
AMP Energy Services Limited · DC/24/2486/FUL
0.2Application Withdrawn2024-09-05
Barnards Meadow, Barnards Way - Micro Energy Storage Facility
AMP Clean Energy · DC/24/2506/FUL
0.2Application Submitted2024-07-18
Halesworth Middle School, Harrisons Lane - Micro Energy Storage System
Aggregated Micro Power Holdings Plc · DC/24/1933/FUL
0.2Application Submitted2024-06-03
Norwich Road Industrial Estate
Eelpower Limited · DC/21/0521/FUL · 1.7 mo to decide
50Under Construction2021-03-26
Ness Point
Conrad Energy · DC/20/3376/FUL · 3.7 mo to decide
Revised2020-12-23
Norwich Road Industrial Estate
RNA Energy · DC/17/0161/FUL
40Revised2017-01-16

Does East Suffolk approve battery storage schemes?

Yes — of the 6 battery storage schemes East Suffolk has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in East Suffolk?

The median time from application to decision is 4.5 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has East Suffolk consented?

61 MW has been consented across 6 approved schemes. A further 9 applications awaits a decision.

Other technologies in East Suffolk

Solar in East SuffolkOnshore wind in East Suffolk

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.