Novarly ParcelRenewable sites

Renewable sitesMarsh Farm

Marsh Farm

Marsh Farm is an operational 14 MW solar farm in Wiltshire, generating since 22 January 2014. Planning permission was granted on 15 January 2013, 6 months after submission. Operator of record: Steadfast Marsh Solar - Innogy (previously BELECTRIC Solar).

14 MW
Capacity
as recorded in REPD
Operational
Status
since 22 January 2014
Solar Photovoltaics
Technology
Steadfast Marsh Solar - Innogy (previously BELECTRIC Solar)
Wiltshire
Authority
England

Planning and build timeline

Application submitted27 July 2012
Permission granted15 January 2013
6 months after submission
Operational22 January 2014
12 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Marsh Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
7.20.1 km
Solar Photovoltaics · Operational
50.3 km
Solar Photovoltaics · Operational
14.54.1 km
Solar Photovoltaics · Operational
49.96.7 km
Solar Photovoltaics · Operational
7.67.3 km
Battery · Operational
507.8 km
Battery · Operational
507.8 km
Battery · Operational
507.8 km

How big is Marsh Farm?

Marsh Farm has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Marsh Farm?

REPD records the operator as Steadfast Marsh Solar - Innogy (previously BELECTRIC Solar). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Marsh Farm approved and built?

The application was submitted on 27 July 2012. Permission was granted on 15 January 2013, 6 months later. The site became operational on 22 January 2014, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1725.

Novarly Parcel · official public data, read properly · parcel.novarly.com