Renewable sites › Lendrum's Bridge Wind Farm ( Extension 2)
Lendrum's Bridge Wind Farm ( Extension 2)
Lendrum's Bridge Wind Farm ( Extension 2) is operational in Mid Ulster with a recorded capacity of 7.3 MW, and has been generating since 2002-12-20.
Planning and build timeline
| Application submitted | 1997-09-12 |
| Permission granted | 1998-05-11 8 months after submission |
| Operational | 2002-12-20 55 months after consent |
Mid Ulster’s record on onshore wind
Mid Ulster has decided 27 onshore wind schemes and approved 85%, taking a median of 21 months. See every onshore wind scheme decision in Mid Ulster →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lendrum's Bridge Wind Farm Wind Onshore · Operational | 5.9 | 2.2 km |
Shantavny Scotch Wind Onshore · Operational | 16.1 | 10 km |
Slieve Divena Phase 1 Wind Farm Wind Onshore · Operational | 30 | 13.1 km |
Slieve Divena Phase 2 Wind Farm Wind Onshore · Operational | 18.8 | 13.1 km |
Altamuskin Extension Wind Onshore · Operational | 7.1 | 13.5 km |
Hunter's Hill Wind Onshore · Operational | 20 | 13.5 km |
Screggagh Wind Onshore · Operational | 19.5 | 14.2 km |
Altamuskin Wind Onshore · Operational | 7.1 | 14.7 km |
How big is Lendrum's Bridge Wind Farm ( Extension 2)?
Lendrum's Bridge Wind Farm ( Extension 2) has a recorded installed capacity of 7.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lendrum's Bridge Wind Farm ( Extension 2)?
REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lendrum's Bridge Wind Farm ( Extension 2) approved and built?
The application was submitted on 1997-09-12. Permission was granted on 1998-05-11, 8 months later. The site became operational on 2002-12-20, 55 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3566.