Renewable sitesLendrum's Bridge Wind Farm

Lendrum's Bridge Wind Farm

Lendrum's Bridge Wind Farm is operational in Mid Ulster with a recorded capacity of 5.9 MW, and has been generating since 2000-02-01.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-02-01
Wind Onshore
Technology
Renewable Energy Systems (RES)
Mid Ulster
Authority
Northern Ireland

Planning and build timeline

Application submitted1997-09-12
Permission granted1998-05-11
8 months after submission
Operational2000-02-01
21 months after consent

Mid Ulster’s record on onshore wind

Mid Ulster has decided 27 onshore wind schemes and approved 85%, taking a median of 21 months. See every onshore wind scheme decision in Mid Ulster

Other built sites within 15 km

SiteMWDistance
Lendrum's Bridge Wind Farm ( Extension 2)
Wind Onshore · Operational
7.32.2 km
Shantavny Scotch
Wind Onshore · Operational
16.111.1 km
Hunter's Hill
Wind Onshore · Operational
2011.5 km
Screggagh
Wind Onshore · Operational
19.512.4 km
Slieve Divena Phase 1 Wind Farm
Wind Onshore · Operational
3013.8 km
Slieve Divena Phase 2 Wind Farm
Wind Onshore · Operational
18.813.8 km
Altamuskin Extension
Wind Onshore · Operational
7.114.2 km

How big is Lendrum's Bridge Wind Farm?

Lendrum's Bridge Wind Farm has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lendrum's Bridge Wind Farm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lendrum's Bridge Wind Farm approved and built?

The application was submitted on 1997-09-12. Permission was granted on 1998-05-11, 8 months later. The site became operational on 2000-02-01, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3568.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council