Altamuskin Extension

Altamuskin Extension is operational in Fermanagh and Omagh with a recorded capacity of 7.1 MW, and has been generating since 2017-03-15.

7.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-15
Wind Onshore
Technology
Altamuskin Windfarm (Energia)
Fermanagh and Omagh
Authority
Northern Ireland

Planning and build timeline

Application submitted2011-04-13
Permission granted2015-01-28
46 months after submission
Operational2017-03-15
26 months after consent

Fermanagh and Omagh’s record on onshore wind

Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh

Other built sites within 15 km

SiteMWDistance
Slieve Divena Phase 2 Wind Farm
Wind Onshore · Operational
18.80.6 km
Slieve Divena Phase 1 Wind Farm
Wind Onshore · Operational
300.6 km
Altamuskin
Wind Onshore · Operational
7.11.5 km
Shantavny Scotch
Wind Onshore · Operational
16.14.3 km
Crockbaravally Wind Farm
Wind Onshore · Operational
7.56.1 km
Gortfinbar
Wind Onshore · Operational
156.9 km
Crockagarran
Wind Onshore · Operational
157.4 km
Crockdun
Wind Onshore · Operational
12.57.4 km

How big is Altamuskin Extension?

Altamuskin Extension has a recorded installed capacity of 7.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Altamuskin Extension?

REPD records the operator as Altamuskin Windfarm (Energia). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Altamuskin Extension approved and built?

The application was submitted on 2011-04-13. Permission was granted on 2015-01-28, 46 months later. The site became operational on 2017-03-15, 26 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4557.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council