Solar planning in Colchester

Colchester has decided 19 solar farms and approved 95% of them, taking a median of 3 months to decide. Consented capacity: 176 MW. 5 applications still awaiting a decision.

95%
Approved
18 granted · 1 refused
3 mo
Median decision
UK 2.3 mo
176 MW
Consented
19 MW refused
1
Appeals
0 allowed on appeal

How Colchester compares

Against the 298 UK authorities with 5+ solar decisions, Colchester sits in the 43rd percentile for approval rate (2 points above the England average) and the 32nd percentile for speed.

Decisions by year

35Approved — 2 (2013)213Approved — 4 (2014)414Approved — 2 (2015)Refused — 1 (2015)315Approved — 1 (2019)119Approved — 1 (2022)122Approved — 4 (2023)423Approved — 1 (2024)124Approved — 3 (2025)325
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (25)

SchemeMWStatusDecided
Tesco Stores, Highwoods Square - Solar Panels
Batchelor Electrical Limited · 260258
0.2Application Submitted2026-02-18
Fordham Road, Wormingford - Solar Panels
Fairfields Farm Produce Limited · 251541 · 1.5 mo to decide
Awaiting Construction2025-09-03
Gosbecks Road - Solar Photovoltaic Panels
SNRG · 250914 · 1.6 mo to decide
0.2Awaiting Construction2025-06-13
Greenacres, Packards Lane - Solar Panels
CSH Environmental Limited · 242396 · 1.8 mo to decide
0.63Awaiting Construction2025-01-15
Lodge Farm, Boxted Road - Solar Panels
P.G Rix Farms Limited · 240907 · 1.8 mo to decide
1.02Awaiting Construction2024-06-20
Military Corrective Training Centre, Berechurch Hall Camp - Solar Panels
Defence Infrastructure Organisation · 241035
0.51Application Submitted2024-05-16
Boxted - Solar Panels
RES Limited · DC/23/05127
20Application Submitted2023-11-02
The Big Yellow Self Storage Co, Bruff Close - Solar panels
Big Yellow Group Plc · 232034 · 1.1 mo to decide
0.18Awaiting Construction2023-10-02
David Lloyd Leisure, United Way - Solar Panels
David Lloyd Leisure Limited · 231714 · 1.8 mo to decide
0.27Awaiting Construction2023-09-06
Wilkin And Sons, Factory Hill - Solar Farm
Wilkin & Sons Limited · 223177 · 5.2 mo to decide
6.15Operational2023-06-06
Plummers Road, Fordham - Solar Array
Arbora Homes · 230379
0.31Application Withdrawn2023-04-26
Birch Solar Farm & Battery Storage
Low Carbon Solar Park 22 Limited · 222151 · 6.9 mo to decide
40Operational2023-03-20
Hollywood Bowl, United Way - Solar Array
Hollywood Bowl Group · 222099
0.27Application Submitted2022-08-08
Layer Farm - Solar Farm
Layer Solar Farm Limited · 202695 · 13.3 mo to decide
49Operational2022-01-13
University Of Essex - Solar Panels
University of Essex · 211994
Application Submitted2021-07-05
Church Road Tesco
Push Energy · 192576 · 1.3 mo to decide
0.2Awaiting Construction2019-11-15
Land Adjacent Claypits Farm (b) (Birch Estate)
Lightsource SPV 186 (community owned) · 150614 · 3.1 mo to decide
2.3Operational2015-06-30
Land Adjacent Claypits Farm (a)
Lightsource Renewable Energy · 150614 · 3.1 mo to decide
5Operational2015-06-30
Holmwood Solar Farm
Holmwood Solar · 142446 · 10.6 mo to decide
19Appeal Refused2015-02-06
Birch Airfield
Push Energy/ NextEnergy Solar Fund (NESF) · 145133 · 2.8 mo to decide
5.6Operational2014-09-16
Boxted Airfield
NextEnergy Solar Fund · 145101 · 3 mo to decide
18.8Operational2014-09-15
Langenhoe Solar Farm
NextEnergy Solar Fund · 132330 · 9.2 mo to decide
21.3Operational2014-08-29
Bluegates Solar Park
Edgar Middleton · 14/00352/FUL · 3 mo to decide
10.5Operational2014-07-04
Highfields Farm (Colchester)
Hive Energy · 121949 (12/1949/FUL) · 9.1 mo to decide
12.2Operational2013-09-25
Highfields Farm (Braintree)
Hive Energy · 12/01472/FUL · 8.4 mo to decide
2.8Operational2013-09-03

Does Colchester approve solar farms?

Yes — of the 19 solar farms Colchester has decided, 95% were approved (18 granted, 1 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Colchester?

The median time from application to decision is 3 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Colchester consented?

176 MW has been consented across 18 approved schemes, with 19 MW refused. A further 5 applications awaits a decision.

Other technologies in Colchester

Battery storage in ColchesterOnshore wind in Colchester

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.