Land at Stalbridge Park

Land at Stalbridge Park is an operational 5 MW solar farm in Dorset, generating since 31 March 2017. Planning permission was granted on 13 October 2015, 3 months after submission. Operator of record: British Solar Renewables / NextEnergy Solar Fund (NESF).

5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2017
Solar Photovoltaics
Technology
British Solar Renewables / NextEnergy Solar Fund (NESF)
Dorset
Authority
England

Planning and build timeline

Application submitted3 July 2015
Permission granted13 October 2015
3 months after submission
Operational31 March 2017
18 months after consent

Screening a site of your own?

RedlineUK · £39

Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land at Stalbridge Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
53.5 km
Solar Photovoltaics · Operational
4.25.1 km
Solar Photovoltaics · Operational
57.1 km
Solar Photovoltaics · Operational
1.58.2 km
Solar Photovoltaics · Operational
1.58.2 km
Solar Photovoltaics · Operational
3.58.6 km
Solar Photovoltaics · Operational
179.3 km
Solar Photovoltaics · Operational
1.89.5 km

How big is Land at Stalbridge Park?

Land at Stalbridge Park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Stalbridge Park?

REPD records the operator as British Solar Renewables / NextEnergy Solar Fund (NESF). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Stalbridge Park approved and built?

The application was submitted on 3 July 2015. Permission was granted on 13 October 2015, 3 months later. The site became operational on 31 March 2017, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5429.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode