Novarly ParcelRenewable sites

Renewable sitesLand at Newlands Farm

Land at Newlands Farm

Land at Newlands Farm is operational in Dorset with a recorded capacity of 5 MW, and has been generating since 2016-02-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-02-15
Solar Photovoltaics
Technology
British Solar Renewables
Dorset
Authority
England

Planning and build timeline

Application submitted2014-10-13
Permission granted2014-12-17
2 months after submission
Operational2016-02-15
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Chickerell Road, Chickerell - Solar Photovoltaics (PV) Equipment
Solar Photovoltaics · Operational
1.3 km
NOTTINGTON LANE SOLAR FARM
Solar Photovoltaics · Operational
51.9 km
Dorchesters Corn Exchange - Solar Panels & Biomass Boiler
Biomass (dedicated) · Under Construction
10.6 km
Dorchesters Corn Exchange - Solar Panels & Biomass Boiler
Solar Photovoltaics · Under Construction
10.6 km
Land at East Farm
Solar Photovoltaics · Operational
513.2 km
Galton Manor Solar Park
Solar Photovoltaics · Operational
514.1 km
Holly Farm Solar Park
Solar Photovoltaics · Operational
514.2 km
Crossways Pit Solar Farm
Solar Photovoltaics · Operational
514.5 km

How big is Land at Newlands Farm?

Land at Newlands Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Newlands Farm?

REPD records the operator as British Solar Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Newlands Farm approved and built?

The application was submitted on 2014-10-13. Permission was granted on 2014-12-17, 2 months later. The site became operational on 2016-02-15, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4703.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council