Dorchesters Corn Exchange - Solar Panels & Biomass Boiler

Dorchesters Corn Exchange - Solar Panels & Biomass Boiler is under construction in Dorset.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Biomass (dedicated)
Technology
Dorchester Town Council
Dorset
Authority
England

Planning and build timeline

Application submitted2021-12-22
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Dorchesters Corn Exchange - Solar Panels & Biomass Boiler
Solar Photovoltaics · Under Construction
0 km
Bourne Farm
Solar Photovoltaics · Operational
2.47.3 km
Bourne Park AD (AD)
Anaerobic Digestion · Operational
1.17.4 km
Bourne Park (Solar)
Solar Photovoltaics · Operational
57.5 km
Crossways Pit Solar Farm
Solar Photovoltaics · Operational
58.1 km
Holly Farm Solar Park
Solar Photovoltaics · Operational
59 km
Land at East Farm
Solar Photovoltaics · Operational
59.2 km
NOTTINGTON LANE SOLAR FARM
Solar Photovoltaics · Operational
59.5 km

How big is Dorchesters Corn Exchange - Solar Panels & Biomass Boiler?

REPD does not record an installed capacity for Dorchesters Corn Exchange - Solar Panels & Biomass Boiler.

Who operates Dorchesters Corn Exchange - Solar Panels & Biomass Boiler?

REPD records the operator as Dorchester Town Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dorchesters Corn Exchange - Solar Panels & Biomass Boiler approved and built?

The application was submitted on 2021-12-22. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11444.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council