Dorchesters Corn Exchange - Solar Panels & Biomass Boiler is a solar farm under construction in Dorset. Planning permission was granted on 5 October 2022, 9 months after submission. Operator of record: Dorchester Town Council.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Dorchester Town Council
Dorset
Authority
England

Planning and build timeline

Application submitted22 December 2021
Permission granted5 October 2022
9 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dorchesters Corn Exchange - Solar Panels & Biomass Boiler’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Under Construction
0 km
Solar Photovoltaics · Operational
2.47.3 km
Anaerobic Digestion · Operational
1.17.4 km
Solar Photovoltaics · Operational
57.5 km
Solar Photovoltaics · Operational
58.1 km
Solar Photovoltaics · Operational
59 km
Solar Photovoltaics · Operational
59.2 km
Solar Photovoltaics · Operational
59.5 km

How big is Dorchesters Corn Exchange - Solar Panels & Biomass Boiler?

REPD does not record an installed capacity for Dorchesters Corn Exchange - Solar Panels & Biomass Boiler.

Who operates Dorchesters Corn Exchange - Solar Panels & Biomass Boiler?

REPD records the operator as Dorchester Town Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dorchesters Corn Exchange - Solar Panels & Biomass Boiler approved and built?

The application was submitted on 22 December 2021. Permission was granted on 5 October 2022, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11443.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode