ParkerSteel Shoreham Plant is an operational 1.8 MW solar farm in Brighton and Hove, generating since 2 September 2015. Planning permission was granted on 20 March 2015, 0 months after submission. Operator of record: Larimin.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2 September 2015
Solar Photovoltaics
Technology
Larimin
Brighton and Hove
Authority
England

Planning and build timeline

Application submitted5 March 2015
Permission granted20 March 2015
0 months after submission
Operational2 September 2015
5 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Brighton and Hove: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with ParkerSteel Shoreham Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
49.998.5 km
Landfill Gas · Operational
29.4 km
Battery · Operational
109.9 km
Solar Photovoltaics · Operational
1014.8 km

How big is ParkerSteel Shoreham Plant?

ParkerSteel Shoreham Plant has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates ParkerSteel Shoreham Plant?

REPD records the operator as Larimin. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was ParkerSteel Shoreham Plant approved and built?

The application was submitted on 5 March 2015. Permission was granted on 20 March 2015, 0 months later. The site became operational on 2 September 2015, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6055.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode