Novarly ParcelRenewable sites

Renewable sitesParkerSteel Shoreham Plant

ParkerSteel Shoreham Plant

ParkerSteel Shoreham Plant is operational in Brighton and Hove with a recorded capacity of 1.8 MW, and has been generating since 2015-09-02.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-09-02
Solar Photovoltaics
Technology
Larimin
Brighton and Hove
Authority
England

Planning and build timeline

Application submitted2015-03-05
Permission granted2015-03-20
0 months after submission
Operational2015-09-02
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Halewick Lane, Sompting - Battery-based Energy Storage Facility
Battery · Under Construction
49.998.5 km
Horton Landfill Site
Landfill Gas · Operational
29.4 km
Kings Barn Farm - Energy Barn
Battery · Operational
109.9 km
Ford Farm (Ashurst)
Solar Photovoltaics · Operational
1014.8 km

How big is ParkerSteel Shoreham Plant?

ParkerSteel Shoreham Plant has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates ParkerSteel Shoreham Plant?

REPD records the operator as Larimin. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was ParkerSteel Shoreham Plant approved and built?

The application was submitted on 2015-03-05. Permission was granted on 2015-03-20, 0 months later. The site became operational on 2015-09-02, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6055.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council