Renewable sites › Halewick Lane, Sompting - Battery-based Energy Storage Facility
Halewick Lane, Sompting - Battery-based Energy Storage Facility
Halewick Lane, Sompting - Battery-based Energy Storage Facility is under construction in Adur with a recorded capacity of 49.99 MW.
Planning and build timeline
| Application submitted | 2019-01-02 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- National Park — South Downs
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Kings Barn Farm - Energy Barn Battery · Operational | 10 | 4.9 km |
Horton Landfill Site Landfill Gas · Operational | 2 | 6.5 km |
ParkerSteel Shoreham Plant Solar Photovoltaics · Operational | 1.8 | 8.5 km |
Ford Farm (Ashurst) Solar Photovoltaics · Operational | 10 | 10.7 km |
Priors Byne Farm Solar Photovoltaics · Operational | 7.6 | 11.1 km |
Land off Hooklands Lane Solar Photovoltaics · Operational | 5 | 12.4 km |
How big is Halewick Lane, Sompting - Battery-based Energy Storage Facility?
Halewick Lane, Sompting - Battery-based Energy Storage Facility has a recorded installed capacity of 49.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Halewick Lane, Sompting - Battery-based Energy Storage Facility?
REPD records the operator as Public Power Solutions (PPS) / West Sussex County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Halewick Lane, Sompting - Battery-based Energy Storage Facility approved and built?
The application was submitted on 2019-01-02. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7168.