Novarly ParcelRenewable sites

Renewable sitesHalewick Lane, Sompting - Battery-based Energy Storage Facility

Halewick Lane, Sompting - Battery-based Energy Storage Facility

Halewick Lane, Sompting - Battery-based Energy Storage Facility is under construction in Adur with a recorded capacity of 49.99 MW.

49.99 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Public Power Solutions (PPS) / West Sussex County Council
Adur
Authority
England

Planning and build timeline

Application submitted2019-01-02
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Kings Barn Farm - Energy Barn
Battery · Operational
104.9 km
Horton Landfill Site
Landfill Gas · Operational
26.5 km
ParkerSteel Shoreham Plant
Solar Photovoltaics · Operational
1.88.5 km
Ford Farm (Ashurst)
Solar Photovoltaics · Operational
1010.7 km
Priors Byne Farm
Solar Photovoltaics · Operational
7.611.1 km
Land off Hooklands Lane
Solar Photovoltaics · Operational
512.4 km

How big is Halewick Lane, Sompting - Battery-based Energy Storage Facility?

Halewick Lane, Sompting - Battery-based Energy Storage Facility has a recorded installed capacity of 49.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Halewick Lane, Sompting - Battery-based Energy Storage Facility?

REPD records the operator as Public Power Solutions (PPS) / West Sussex County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Halewick Lane, Sompting - Battery-based Energy Storage Facility approved and built?

The application was submitted on 2019-01-02. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7168.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council