Halewick Lane, Sompting - Battery-based Energy Storage Facility is a 49.99 MW battery storage site under construction in Adur. REPD does not record the planning grant date. Operator of record: Public Power Solutions (PPS) / West Sussex County Council.

49.99 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Public Power Solutions (PPS) / West Sussex County Council
Adur
Authority
England

Planning and build timeline

Application submitted2 January 2019
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Adur: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Halewick Lane, Sompting - Battery-based Energy Storage Facility’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Operational
104.9 km
Landfill Gas · Operational
26.5 km
Solar Photovoltaics · Operational
1.88.5 km
Solar Photovoltaics · Operational
1010.7 km
Solar Photovoltaics · Operational
7.611.1 km
Solar Photovoltaics · Operational
512.4 km

How big is Halewick Lane, Sompting - Battery-based Energy Storage Facility?

Halewick Lane, Sompting - Battery-based Energy Storage Facility has a recorded installed capacity of 49.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Halewick Lane, Sompting - Battery-based Energy Storage Facility?

REPD records the operator as Public Power Solutions (PPS) / West Sussex County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Halewick Lane, Sompting - Battery-based Energy Storage Facility approved and built?

The application was submitted on 2 January 2019. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7168.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode