Howpark Wind Farm is a 16 MW onshore wind farm under construction in Scottish Borders. Planning permission was granted on 24 April 2018, 20 months after submission. Operator of record: Eurowind (UK) Limited.

16 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Onshore
Technology
Eurowind (UK) Limited
Scottish Borders
Authority
Scotland

Planning and build timeline

Application submitted23 August 2016
Permission granted24 April 2018
20 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Scottish Borders approves 56% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Howpark Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Borders’s record on onshore wind

Scottish Borders has decided 41 onshore wind schemes and approved 56%, taking a median of 13.6 months. See every onshore wind scheme decision in Scottish Borders

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
28.61.2 km
Wind Onshore · Operational
12 km
Wind Onshore · Operational
28.72.5 km
Wind Onshore · Operational
2.43.5 km
Wind Onshore · Operational
29.95.6 km
Wind Onshore · Operational
56.6 km
Wind Onshore · Operational
6.97.4 km
Wind Onshore · Operational
1.58.8 km

How big is Howpark Wind Farm?

Howpark Wind Farm has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Howpark Wind Farm?

REPD records the operator as Eurowind (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Howpark Wind Farm approved and built?

The application was submitted on 23 August 2016. Permission was granted on 24 April 2018, 20 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6214.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode