Planning and build timeline

Application submitted2013-07-12
Permission granted2013-10-01
3 months after submission
Operational2014-03-31
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Vale of White Horse’s record on solar

Vale of White Horse has decided 23 solar farms and approved 91%, taking a median of 3 months. See every solar farm decision in Vale of White Horse

Other built sites within 15 km

SiteMWDistance
Goose Willow Farm - extension
Solar Photovoltaics · Operational
71.8 km
Steventon Solar Park
Solar Photovoltaics · Operational
102.1 km
Goose Willow Farm
Solar Photovoltaics · Operational
11.52.2 km
Landmead Farm (East Hanney)
Solar Photovoltaics · Operational
463.5 km
Elms Farm
Solar Photovoltaics · Operational
293.8 km
South Car Park - Solar photovoltaic carport system
Solar Photovoltaics · Operational
5.6 km
Avon Road Car Park - Solar Photovoltaic Carport System
Solar Photovoltaics · Operational
1.625.7 km
Sutton Courtenay Landfill Scheme
Landfill Gas · Operational
5.65.8 km

How big is Hill Farm Solar Park (VoWH)?

Hill Farm Solar Park (VoWH) has a recorded installed capacity of 14.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hill Farm Solar Park (VoWH)?

REPD records the operator as Hill Farm Solar Park Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hill Farm Solar Park (VoWH) approved and built?

The application was submitted on 2013-07-12. Permission was granted on 2013-10-01, 3 months later. The site became operational on 2014-03-31, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1331.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council