Renewable sitesAvon Road Car Park - Solar Photovoltaic Carport System

Avon Road Car Park - Solar Photovoltaic Carport System

Avon Road Car Park - Solar Photovoltaic Carport System is operational in Vale of White Horse with a recorded capacity of 1.62 MW, and has been generating since 2022-07-26.

1.62 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-07-26
Solar Photovoltaics
Technology
Science and Technology Facilities Council
Vale of White Horse
Authority
England

Planning and build timeline

Application submitted2021-01-21
Permission granted2021-04-30
3 months after submission
Operational2022-07-26
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Vale of White Horse’s record on solar

Vale of White Horse has decided 23 solar farms and approved 91%, taking a median of 3 months. See every solar farm decision in Vale of White Horse

Other built sites within 15 km

SiteMWDistance
South Car Park - Solar photovoltaic carport system
Solar Photovoltaics · Operational
0.3 km
Hill Farm Solar Park (VoWH)
Solar Photovoltaics · Operational
14.85.7 km
Elms Farm
Solar Photovoltaics · Operational
297.3 km
Sutton Courtenay Landfill Scheme
Landfill Gas · Operational
5.67.4 km
Goose Willow Farm - extension
Solar Photovoltaics · Operational
77.4 km
Steventon Solar Park
Solar Photovoltaics · Operational
107.8 km
Goose Willow Farm
Solar Photovoltaics · Operational
11.57.9 km
Sutton Courtney
Landfill Gas · Operational
67.9 km

How big is Avon Road Car Park - Solar Photovoltaic Carport System?

Avon Road Car Park - Solar Photovoltaic Carport System has a recorded installed capacity of 1.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Avon Road Car Park - Solar Photovoltaic Carport System?

REPD records the operator as Science and Technology Facilities Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Avon Road Car Park - Solar Photovoltaic Carport System approved and built?

The application was submitted on 2021-01-21. Permission was granted on 2021-04-30, 3 months later. The site became operational on 2022-07-26, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8799.