Renewable sites › Avon Road Car Park - Solar Photovoltaic Carport System
Avon Road Car Park - Solar Photovoltaic Carport System
Avon Road Car Park - Solar Photovoltaic Carport System is an operational 1.62 MW solar farm in Vale of White Horse, generating since 26 July 2022. Planning permission was granted on 30 April 2021, 3 months after submission. Operator of record: Science and Technology Facilities Council.
Planning and build timeline
| Application submitted | 21 January 2021 |
| Permission granted | 30 April 2021 3 months after submission |
| Operational | 26 July 2022 15 months after consent |
Screening a site of your own?
Vale of White Horse approves 91% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Avon Road Car Park - Solar Photovoltaic Carport System’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- National Landscape (AONB) — North Wessex Downs
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Vale of White Horse’s record on solar
Vale of White Horse has decided 23 solar farms and approved 91%, taking a median of 3 months. See every solar farm decision in Vale of White Horse →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | — | 0.3 km |
Solar Photovoltaics · Operational | 14.8 | 5.7 km |
Solar Photovoltaics · Operational | 29 | 7.3 km |
Landfill Gas · Operational | 5.6 | 7.4 km |
Solar Photovoltaics · Operational | 7 | 7.4 km |
Solar Photovoltaics · Operational | 10 | 7.8 km |
Solar Photovoltaics · Operational | 11.5 | 7.9 km |
Landfill Gas · Operational | 6 | 7.9 km |
How big is Avon Road Car Park - Solar Photovoltaic Carport System?
Avon Road Car Park - Solar Photovoltaic Carport System has a recorded installed capacity of 1.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Avon Road Car Park - Solar Photovoltaic Carport System?
REPD records the operator as Science and Technology Facilities Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Avon Road Car Park - Solar Photovoltaic Carport System approved and built?
The application was submitted on 21 January 2021. Permission was granted on 30 April 2021, 3 months later. The site became operational on 26 July 2022, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8799.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode