Renewable sites › Heming Point Roof Mounted Solar Panels
Heming Point Roof Mounted Solar Panels
Heming Point Roof Mounted Solar Panels is operational in Redditch with a recorded capacity of 0.2 MW, and has been generating since 2021-09-27.
Planning and build timeline
| Application submitted | 2020-12-02 |
| Permission granted | 2021-02-18 3 months after submission |
| Operational | 2021-09-27 7 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Redditch’s record on solar
Redditch has decided 7 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Redditch →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Arthur Street - Solar Panels Solar Photovoltaics · Operational | 0.19 | 2.7 km |
Morton Wood Farm Solar Photovoltaics · Operational | 4.8 | 12.4 km |
Drayton Manor Farm Solar Photovoltaics · Operational | 25 | 12.5 km |
Burton Farm Solar Photovoltaics · Operational | 4.4 | 13.3 km |
Bumble Hole Lane, Dodford - Solar PV Solar Photovoltaics · Operational | 0.67 | 14.5 km |
Salford Lodge Solar Photovoltaics · Operational | 5 | 14.6 km |
How big is Heming Point Roof Mounted Solar Panels?
Heming Point Roof Mounted Solar Panels has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Heming Point Roof Mounted Solar Panels?
REPD records the operator as TRT Lighting Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Heming Point Roof Mounted Solar Panels approved and built?
The application was submitted on 2020-12-02. Permission was granted on 2021-02-18, 3 months later. The site became operational on 2021-09-27, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8178.
Novarly Parcel · official public data, read properly · parcel.novarly.com