Hellrigg Wind farm is an operational 9.2 MW onshore wind farm in Cumberland, generating since 14 September 2011. Planning permission was granted on 11 December 2007, 10 months after submission. Operator of record: Npower Renewables.

9.2 MW
Capacity
as recorded in REPD
Operational
Status
since 14 September 2011
Wind Onshore
Technology
Npower Renewables
Cumberland
Authority
England

Planning and build timeline

Application submitted29 January 2007
Permission granted11 December 2007
10 months after submission
Operational14 September 2011
45 months after consent

Screening a site of your own?

RedlineUK · £39

Cumberland approves 66% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hellrigg Wind farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
10.8 km
Wind Onshore · Operational
6.28.2 km
Solar Photovoltaics · Operational
198.5 km
Anaerobic Digestion · Operational
510.6 km
Anaerobic Digestion · Operational
111.4 km
Wind Onshore · Operational
3.912.3 km

How big is Hellrigg Wind farm?

Hellrigg Wind farm has a recorded installed capacity of 9.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hellrigg Wind farm?

REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hellrigg Wind farm approved and built?

The application was submitted on 29 January 2007. Permission was granted on 11 December 2007, 10 months later. The site became operational on 14 September 2011, 45 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3002.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode