Novarly ParcelRenewable sites

Renewable sitesDryholme Farm (Farm AD)

Dryholme Farm (Farm AD)

Dryholme Farm (Farm AD) is an operational 1 MW anaerobic digestion plant in Cumberland, generating since 4 November 2011. Planning permission was granted on 16 June 2010, 6 months after submission. Operator of record: Kirk Environmental.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 4 November 2011
Anaerobic Digestion
Technology
Kirk Environmental
Cumberland
Authority
England

Planning and build timeline

Application submitted2 December 2009
Permission granted16 June 2010
6 months after submission
Operational4 November 2011
17 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cumberland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dryholme Farm (Farm AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
9.20.8 km
Wind Onshore · Operational
6.28.6 km
Solar Photovoltaics · Operational
199 km
Anaerobic Digestion · Operational
511.1 km
Anaerobic Digestion · Operational
111.8 km
Wind Onshore · Operational
3.913.1 km

How big is Dryholme Farm (Farm AD)?

Dryholme Farm (Farm AD) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dryholme Farm (Farm AD)?

REPD records the operator as Kirk Environmental. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dryholme Farm (Farm AD) approved and built?

The application was submitted on 2 December 2009. Permission was granted on 16 June 2010, 6 months later. The site became operational on 4 November 2011, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 267.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode