Harestanes Windfarm
Harestanes Windfarm is a 100 MW battery storage site under construction in Scotland. Planning permission was granted on 20 December 2019, 6 months after submission. Operator of record: ScottishPower Renewables.
Planning and build timeline
| Application submitted | 20 June 2019 |
| Permission granted | 20 December 2019 6 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Harestanes Windfarm’s recorded coordinate — swap in your own postcode or coordinates.
Scottish Government (S36)’s record on battery storage
Scottish Government (S36) has decided 108 battery storage schemes and approved 94%, taking a median of 17.3 months. See every battery storage scheme decision in Scottish Government (S36) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 136 | 2.9 km |
Wind Onshore · Operational | 25 | 3.3 km |
Wind Onshore · Operational | 30 | 10.6 km |
Battery · Under Construction | 49.9 | 10.7 km |
How big is Harestanes Windfarm?
Harestanes Windfarm has a recorded installed capacity of 100 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Harestanes Windfarm?
REPD records the operator as ScottishPower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Harestanes Windfarm approved and built?
The application was submitted on 20 June 2019. Permission was granted on 20 December 2019, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7395.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode