Renewable sites › East Kilbride - Battery storage
East Kilbride - Battery storage
East Kilbride - Battery storage is a 49.9 MW battery storage site under construction in South Lanarkshire. Planning permission was granted on 22 August 2022, 5 months after submission. Operator of record: Engie Regeneration Limited.
Planning and build timeline
| Application submitted | 28 March 2022 |
| Permission granted | 22 August 2022 5 months after submission |
| Operational | not recorded |
Screening a site of your own?
South Lanarkshire approves 60% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with East Kilbride - Battery storage’s recorded coordinate — swap in your own postcode or coordinates.
South Lanarkshire’s record on battery storage
South Lanarkshire has decided 10 battery storage schemes and approved 60%, taking a median of 6.9 months. See every battery storage scheme decision in South Lanarkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 25 | 10.4 km |
Battery · Under Construction | 100 | 10.7 km |
Wind Onshore · Operational | 136 | 13.4 km |
Wind Onshore · Operational | 350 | 13.6 km |
How big is East Kilbride - Battery storage?
East Kilbride - Battery storage has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates East Kilbride - Battery storage?
REPD records the operator as Engie Regeneration Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was East Kilbride - Battery storage approved and built?
The application was submitted on 28 March 2022. Permission was granted on 22 August 2022, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9013.