Harestanes

Harestanes is an operational 136 MW onshore wind farm in Scotland, generating since 1 July 2014. Planning permission was granted on 10 September 2007, 42 months after submission. Operator of record: Scottish Power Renewables.

136 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 2014
Wind Onshore
Technology
Scottish Power Renewables
National
Authority
Scotland

Planning and build timeline

Application submitted17 March 2004
Permission granted10 September 2007
42 months after submission
Operational1 July 2014
82 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Harestanes’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
1002.9 km
Wind Onshore · Operational
253.9 km
Wind Onshore · Operational
307.8 km
Battery · Under Construction
49.913.4 km

How big is Harestanes?

Harestanes has a recorded installed capacity of 136 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Harestanes?

REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Harestanes approved and built?

The application was submitted on 17 March 2004. Permission was granted on 10 September 2007, 42 months later. The site became operational on 1 July 2014, 82 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4119.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode