Novarly ParcelRenewable sites

Renewable sitesAttleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion

Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion

Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion is operational in Breckland with a recorded capacity of 1 MW, and has been generating since 2022-09-28.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-09-28
Anaerobic Digestion
Technology
Privelage Finance Ltd / Attleborough AD Plant Limited
Breckland
Authority
England

Planning and build timeline

Application submitted2019-12-11
Permission granted2022-08-04
32 months after submission
Operational2022-09-28
2 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Attleborough Road Solar Farm
Solar Photovoltaics · Under Construction
303.5 km
Rookery Business Park
Solar Photovoltaics · Operational
55.1 km
Snetterton Biomass Plant
Biomass (dedicated) · Operational
44.25.4 km
Airfield Farm PV
Solar Photovoltaics · Operational
56 km
Hardingham Solar Farm - extension
Solar Photovoltaics · Operational
5.29.5 km
Hardingham Solar Farm
Solar Photovoltaics · Operational
14.89.6 km
HMP Wayland - Solar Panels
Solar Photovoltaics · Operational
0.349.8 km
Kenninghall Solar / Hazeldick Solar
Solar Photovoltaics · Operational
89.8 km

How big is Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion?

Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion?

REPD records the operator as Privelage Finance Ltd / Attleborough AD Plant Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion approved and built?

The application was submitted on 2019-12-11. Permission was granted on 2022-08-04, 32 months later. The site became operational on 2022-09-28, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7590.