Renewable sites › Hall Farm, West End Northwold - Solar Farm
Hall Farm, West End Northwold - Solar Farm
Hall Farm, West End Northwold - Solar Farm is an operational 7.5 MW battery storage site in King's Lynn and West Norfolk, generating since 28 February 2025. Planning permission was granted on 15 March 2022, 3 months after submission. Operator of record: Ampyr Solar Europe.
Planning and build timeline
| Application submitted | 10 December 2021 |
| Permission granted | 15 March 2022 3 months after submission |
| Operational | 28 February 2025 36 months after consent |
Screening a site of your own?
King's Lynn and West Norfolk approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Hall Farm, West End Northwold - Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Conservation area — NORTHWOLD Conservation Area
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
King's Lynn and West Norfolk’s record on battery storage
King's Lynn and West Norfolk has decided 15 battery storage schemes and approved 100%, taking a median of 6.7 months. See every battery storage scheme decision in King's Lynn and West Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 10 | 0 km |
Solar Photovoltaics · Operational | 6.1 | 1.7 km |
Solar Photovoltaics · Operational | 6 | 2.3 km |
Anaerobic Digestion · Operational | 1 | 13.2 km |
Solar Photovoltaics · Operational | 4.8 | 13.4 km |
Solar Photovoltaics · Operational | 12.5 | 13.5 km |
Wind Onshore · Operational | 4 | 13.8 km |
Solar Photovoltaics · Operational | 1 | 14 km |
How big is Hall Farm, West End Northwold - Solar Farm?
Hall Farm, West End Northwold - Solar Farm has a recorded installed capacity of 7.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hall Farm, West End Northwold - Solar Farm?
REPD records the operator as Ampyr Solar Europe. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hall Farm, West End Northwold - Solar Farm approved and built?
The application was submitted on 10 December 2021. Permission was granted on 15 March 2022, 3 months later. The site became operational on 28 February 2025, 36 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 18383.
Novarly Parcel · official public data, read properly · parcel.novarly.com