Planning and build timeline
| Application submitted | 2021-12-10 |
| Permission granted | 2022-03-15 3 months after submission |
| Operational | 2025-02-28 36 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Conservation area — NORTHWOLD Conservation Area
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
King's Lynn and West Norfolk’s record on solar
King's Lynn and West Norfolk has decided 31 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in King's Lynn and West Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hall Farm, West End Northwold - Solar Farm Battery · Operational | 7.5 | 0 km |
Reaches Farm Solar Park Solar Photovoltaics · Operational | 6.1 | 1.7 km |
Meadow Farm solar park Solar Photovoltaics · Operational | 6 | 2.3 km |
Toggam Farm - Anaerobic Digestion Plant Anaerobic Digestion · Operational | 1 | 13.2 km |
Ryston Estate Solar Park Solar Photovoltaics · Operational | 4.8 | 13.4 km |
Toggam Farm Solar Photovoltaics · Operational | 12.5 | 13.5 km |
North Pickenham Airfield Wind Onshore · Operational | 4 | 13.8 km |
Field north of Water Treatment Works / Hoggs Drove Solar Photovoltaics · Operational | 1 | 14 km |
How big is Hall Farm, West End Northwold - Solar Farm?
Hall Farm, West End Northwold - Solar Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hall Farm, West End Northwold - Solar Farm?
REPD records the operator as Ampyr Solar Europe. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hall Farm, West End Northwold - Solar Farm approved and built?
The application was submitted on 2021-12-10. Permission was granted on 2022-03-15, 3 months later. The site became operational on 2025-02-28, 36 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 18382.