Green's Lodge Farm is operational in North West Leicestershire with a recorded capacity of 2 MW, and has been generating since 2013-05-14.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-05-14
Anaerobic Digestion
Technology
A C Shropshire Ltd
North West Leicestershire
Authority
England

Planning and build timeline

Application submitted2009-09-09
Permission grantednot recorded
Operational2013-05-14

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Newhurst Quarry
EfW Incineration · Operational
424.3 km
Tower Hayes Farm
Solar Photovoltaics · Operational
54.3 km
Thornton Lane
Solar Photovoltaics · Operational
2.74.4 km
Pretoria Road
Solar Photovoltaics · Operational
4.95 km
Bradgate Quarry Landfill Gas Scheme
Landfill Gas · Operational
2.57.4 km
Desford Brick Works, Bagworth - Solar Panels
Solar Photovoltaics · Operational
2.67.6 km
Crown Farm
Solar Photovoltaics · Operational
67.7 km
Land at Hill Farm
Solar Photovoltaics · Operational
1.29 km

How big is Green's Lodge Farm?

Green's Lodge Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Green's Lodge Farm?

REPD records the operator as A C Shropshire Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Green's Lodge Farm approved and built?

The application was submitted on 2009-09-09. REPD does not record a grant date. The site became operational on 2013-05-14.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 46.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council