Renewable sitesDesford Brick Works, Bagworth - Solar Panels

Desford Brick Works, Bagworth - Solar Panels

Desford Brick Works, Bagworth - Solar Panels is operational in Hinckley and Bosworth with a recorded capacity of 2.6 MW, and has been generating since 2024-04-01.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-04-01
Solar Photovoltaics
Technology
Leicestershire County Council
Hinckley and Bosworth
Authority
England

Planning and build timeline

Application submitted2022-05-27
Permission granted2022-07-14
2 months after submission
Operational2024-04-01
21 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hinckley and Bosworth’s record on solar

Hinckley and Bosworth has decided 25 solar farms and approved 96%, taking a median of 3 months. See every solar farm decision in Hinckley and Bosworth

Other built sites within 15 km

SiteMWDistance
Lindridge Farm
Solar Photovoltaics · Operational
51.5 km
Halifax Farm
Wind Onshore · Operational
1.61.8 km
Thornton Lane
Solar Photovoltaics · Operational
2.73.2 km
Tower Hayes Farm
Solar Photovoltaics · Operational
53.3 km
Hall Farm Solar Farm (Newbold Verdon)
Solar Photovoltaics · Operational
53.5 km
Crown Farm
Solar Photovoltaics · Operational
63.6 km
Desford Solar Farm
Solar Photovoltaics · Operational
54.4 km
Pretoria Road
Solar Photovoltaics · Operational
4.95 km

How big is Desford Brick Works, Bagworth - Solar Panels?

Desford Brick Works, Bagworth - Solar Panels has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Desford Brick Works, Bagworth - Solar Panels?

REPD records the operator as Leicestershire County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Desford Brick Works, Bagworth - Solar Panels approved and built?

The application was submitted on 2022-05-27. Permission was granted on 2022-07-14, 2 months later. The site became operational on 2024-04-01, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11513.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council