Crown Farm is operational in Hinckley and Bosworth with a recorded capacity of 6 MW, and has been generating since 2017-03-01.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-01
Solar Photovoltaics
Technology
Suncredit UK (Sunventures 7)
Hinckley and Bosworth
Authority
England

Planning and build timeline

Application submitted2015-07-28
Permission granted2015-09-30
2 months after submission
Operational2017-03-01
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hinckley and Bosworth’s record on solar

Hinckley and Bosworth has decided 25 solar farms and approved 96%, taking a median of 3 months. See every solar farm decision in Hinckley and Bosworth

Other built sites within 15 km

SiteMWDistance
Pretoria Road
Solar Photovoltaics · Operational
4.93 km
Desford Brick Works, Bagworth - Solar Panels
Solar Photovoltaics · Operational
2.63.6 km
Hall Farm Solar Farm (Newbold Verdon)
Solar Photovoltaics · Operational
54 km
Halifax Farm
Wind Onshore · Operational
1.64 km
Tower Hayes Farm
Solar Photovoltaics · Operational
54.2 km
Thornton Lane
Solar Photovoltaics · Operational
2.74.4 km
Lindridge Farm
Solar Photovoltaics · Operational
54.5 km
Green's Lodge Farm
Anaerobic Digestion · Operational
27.7 km

How big is Crown Farm?

Crown Farm has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crown Farm?

REPD records the operator as Suncredit UK (Sunventures 7). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crown Farm approved and built?

The application was submitted on 2015-07-28. Permission was granted on 2015-09-30, 2 months later. The site became operational on 2017-03-01, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5357.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council