Renewable sites › Glen Kyllachy Wind Farm
Glen Kyllachy Wind Farm
Glen Kyllachy Wind Farm is operational in Highland with a recorded capacity of 48.5 MW, and has been generating since 2022-01-01.
Planning and build timeline
| Application submitted | 2013-06-28 |
| Permission granted | 2015-04-22 22 months after submission |
| Operational | 2022-01-01 80 months after consent |
Highland’s record on onshore wind
Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Farr Wind Farm Wind Onshore · Operational | 92 | 1.8 km |
Moy Wind Farm (2nd Application) Wind Onshore · Operational | 66 | 7.9 km |
Aberarder Wind Farm Wind Onshore · Under Construction | 49.9 | 11.8 km |
Dunmaglass Wind Farm Wind Onshore · Operational | 94 | 12.8 km |
Tom Nan Clach Wind Onshore · Operational | 39 | 14.2 km |
How big is Glen Kyllachy Wind Farm?
Glen Kyllachy Wind Farm has a recorded installed capacity of 48.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Glen Kyllachy Wind Farm?
REPD records the operator as Greencoat UK Wind. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Glen Kyllachy Wind Farm approved and built?
The application was submitted on 2013-06-28. Permission was granted on 2015-04-22, 22 months later. The site became operational on 2022-01-01, 80 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4371.
Novarly Parcel · official public data, read properly · parcel.novarly.com