Garlenick Estate 2 - Wind Turbines is an operational 4 MW onshore wind farm in Cornwall, generating since 18 June 2015. Planning permission was granted on 31 January 2013, 3 months after submission. Operator of record: Airvolution Energy.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 18 June 2015
Wind Onshore
Technology
Airvolution Energy
Cornwall
Authority
England

Planning and build timeline

Application submitted1 November 2012
Permission granted31 January 2013
3 months after submission
Operational18 June 2015
29 months after consent

Screening a site of your own?

RedlineUK · £39

Cornwall approves 74% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Garlenick Estate 2 - Wind Turbines’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on onshore wind

Cornwall has decided 35 onshore wind schemes and approved 74%, taking a median of 7.5 months. See every onshore wind scheme decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
53.8 km
Solar Photovoltaics · Operational
74.2 km
Solar Photovoltaics · Operational
4.74.8 km
Solar Photovoltaics · Operational
8.35 km
Solar Photovoltaics · Operational
55 km
Solar Photovoltaics · Operational
125.3 km
Solar Photovoltaics · Operational
4.85.5 km
Wind Onshore · Under Construction
4.36.5 km

How big is Garlenick Estate 2 - Wind Turbines?

Garlenick Estate 2 - Wind Turbines has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Garlenick Estate 2 - Wind Turbines?

REPD records the operator as Airvolution Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Garlenick Estate 2 - Wind Turbines approved and built?

The application was submitted on 1 November 2012. Permission was granted on 31 January 2013, 3 months later. The site became operational on 18 June 2015, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3917.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode