Renewable sites › Eveley Farm
Eveley Farm
Eveley Farm is operational in Test Valley with a recorded capacity of 49 MW, and has been generating since 2016-03-17.
Planning and build timeline
| Application submitted | 2015-02-16 |
| Permission granted | 2015-07-27 5 months after submission |
| Operational | 2016-03-17 8 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Test Valley’s record on solar
Test Valley has decided 37 solar farms and approved 95%, taking a median of 5 months. See every solar farm decision in Test Valley →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Saxley Farm Solar Photovoltaics · Operational | 5 | 6 km |
Westover Farm Solar Photovoltaics · Operational | 7 | 6.3 km |
Abbots Ann Solar Photovoltaics · Operational | 7 | 6.4 km |
Fullenton Solar Farm Solar Photovoltaics · Operational | 4.2 | 7.4 km |
Cowdown Lane Solar Photovoltaics · Operational | 40 | 11 km |
Andover Solar Farm Solar Photovoltaics · Operational | 5 | 11.5 km |
Lains Farm Solar Photovoltaics · Operational | 5 | 11.6 km |
Three Maids Hill Solar Farm Solar Photovoltaics · Operational | 25 | 12.8 km |
How big is Eveley Farm?
Eveley Farm has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Eveley Farm?
REPD records the operator as PS Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Eveley Farm approved and built?
The application was submitted on 2015-02-16. Permission was granted on 2015-07-27, 5 months later. The site became operational on 2016-03-17, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5080.